Hotel Ibis |Tijuana, B.C.
![hotel](https://www.btgamericas.com/site/wp-content/uploads/2020/11/hotel.jpg)
The Project
![](https://www.btgamericas.com/site/wp-content/uploads/2020/01/favicon.png)
Design Systems:
- Building Control and Management System.
- Air Conditioning Automation System.
- Autonomous VRF System with Integration.
- Voice and Data Infrastructure.
- Electrical Energy Metering by Groups of Large Consumers.
- Building Management System (BMS).
![](https://www.btgamericas.com/site/wp-content/uploads/2020/01/favicon.png)
Implementation of the Designed Systems.
![](https://www.btgamericas.com/site/wp-content/uploads/2020/01/favicon.png)
System Integration.
Interface
![hotel001](https://www.btgamericas.com/site/wp-content/uploads/2020/11/hotel001.png)